Indicators
Operational capacity
MW · one_off
Data-centre capacity the operator states is live (in operation), in megawatts, as stated. Kept apart from announced or under-construction capacity, never added to it.
Methodology: Only a figure the operator itself states as live or operational, with its wording in the note. Site figures are never summed into a group total.
No verified figure held yet.