Money and business in the Middle East.

Economy

AED 2.1 trillion — Mohammed bin Rashid announces projects under way in Dubai

Sheikh Mohammed bin Rashid said Dubai has Dh2.1 trillion of projects under way across multiple sectors.

· Last verified: 14 Oct 2026 (The National)

Summary

  • Sheikh Mohammed bin Rashid said Dubai has Dh2.1 trillion of projects under way across multiple sectors.
  • Real estate takes the largest share at Dh1.1 trillion, covering roughly 350,000 planned homes to 2030.
  • The spending signals Dubai positioning itself for a new growth phase built on expanded capacity.

The latest

A Dh2.1 trillion portfolio of active projects spanning housing, transport, aviation and infrastructure is under way in Dubai, Sheikh Mohammed bin Rashid, Vice President and Ruler of Dubai, announced at the Mohammed bin Rashid Leadership Forum. He told the gathering at Dubai World Trade Centre that the emirate was building a city within a city, and that more projects would be announced.

Details

  • The headline figure: The Dh2.1 trillion covers projects already active rather than a forward budget request, according to The National's account of the announcement. It spans four broad areas — housing, transport, aviation and infrastructure — and Sheikh Mohammed indicated the list is not closed, with further projects still to be announced.
  • Real estate share: Dh1.1 trillion, slightly more than half the total portfolio, is allocated to real estate development running to 2030. About 350,000 residential units are planned under that allocation. No breakdown was given of how those units divide between developers, price segments or districts.
  • Airport spending: Dh128 billion is directed to Al Maktoum International Airport, designed to handle up to 260 million passengers annually. That capacity target is the scale marker for the aviation component, positioning the facility as the centrepiece of the emirate's long-term air traffic plans.
  • Fleet expansion: A further Dh328 billion is set aside to expand the Emirates and flydubai fleets — the single largest line item after real estate. An additional Dh18.7 billion goes to a new Emirates engineering and maintenance complex, tying the fleet growth to in-house servicing capacity.
  • Roads and rail: Dh100 billion is allocated to road upgrades and the Dubai Metro Blue and Gold lines, the two newest additions to the network. The allocation groups surface road works and rail extensions in one envelope rather than separating them.
  • Utilities and sewerage: Dh151 billion is committed to new power and water grid infrastructure, with Dh80 billion for the Dubai Strategic Sewerage Tunnels system. Together the two lines account for Dh231 billion, placing basic utility capacity ahead of transport in the spending order.
  • Financial district: Dh100 billion has been set aside for Phase 2 of the Dubai International Financial Centre, extending the emirate's main financial free zone. No completion timeline for the phase was given at the forum.
  • The framing: Sheikh Mohammed described the period as a remarkable one for growth and development and called it the ideal time to invest in Dubai and its infrastructure. He added that "cities that aspire for progress act before others," calling for leaders able to turn ideas into tangible outcomes.
  • The setting: The annual Mohammed bin Rashid Leadership Forum gathered 1,000 government and private sector leaders at Dubai World Trade Centre, alongside experts, decision-makers and academics. The venue made the announcement a leadership-audience address rather than a budget statement.

Between the lines

The allocation order is itself a signal. Utilities and sewerage together draw Dh231 billion against Dh100 billion for roads and metro lines, while 350,000 planned homes sit alongside an airport built for 260 million passengers. The spending is weighted toward the grid capacity a much larger resident and transit population would require, not toward visible surface projects.

What's next

Sheikh Mohammed said further projects would be announced, without naming them or giving a date. Watch for timelines on DIFC Phase 2, the Metro Blue and Gold lines, and delivery schedules for the 350,000 planned residential units.

Source: The National