Power and water
Mohammed bin Rashid Al Maktoum Solar Park
United Arab Emirates · Operational
DEWA's single-site solar park, developed through independent power producer phases, had an installed capacity of 3,860 MW in 2026, from photovoltaic and concentrated solar power plants. DEWA plans to raise capacity above 8,000 MW by 2030; the 1,800 MW sixth phase is still being completed, and the seventh phase (2,000 MW PV plus 1,400 MW / 8,400 MWh of battery storage) is in tender.
www.dewa.gov.ae/en/about-us/strategic-initiatives/mbr-solar-park ↗
- Owner
- Dubai Electricity and Water Authority (DEWA)
- Location
- Seih Al Dahal, Dubai
- Expected
- Above 8,000 MW by 2030
- Status source
- Operational · 13 May 2026
- Status checked
- 27 Sept 2026
Verified · updated 28 Sept 2026
Key facts
$13.6 bn
Announced project value
Masdar·Projected to 2030, stated Feb 2024(estimate)·21 Feb 2024·About this indicator